Facebook Pixel
AVG PTR20-1000 Pressure Temperature Relief Valve 1000 KPA 20mm 3/4

AVG PTR20-1000 Pressure Temperature Relief Valve 1000 KPA 20mm 3/4" BSP

Please select a wishlist
AVG 20mm Expansion Control Valve 700 KPA ECV20-700

AVG ECV20-700 Expansion Control Valve 700 KPA 20mm 3/4"

AVG 850 KPA 20mm Pressure Temperature Relief Valve PTR20-850

AVG PTR20-850 Pressure Temperature Relief Valve 850 KPA 20mm 3/4" BSP

AVG PTR20-1000 Pressure Temperature Relief Valve 1000 KPA 20mm 3/4" BSP

$126.12
Availability: In stock
CODE:
1631746
Show prices
INCL
EXCL
GST
CODE : 1631746
Pressure and Temperature Relief valve (PTR) is designed to relieve the increase in pressure caused by water expansion during the normal heating cycle. High pressure may cause excessive discharge and possible premature failure of the operating relief valve (see table). The maximum water pressure usually occurs during the night, at the time of lowest water usage. In any mains pressure water heater installation if the water pressure exceeds 80% of the nominal set pressure of the operating relief valve, a Pressure Limiting Valve must be fitted to the cold inlet. If a cold water expansion control valve is fitted it will have a lower set pressure than the PTR valve and therefore will be the main operating relief valve.

20mm 3/4" BSP
Pressure Setting 1000kPA
CAUTION: Danger of scalding this valve relieves hot water.
AVG valves should always be installed by a licensed plumber in accordance with National Plumbing Code
AVG PTR20-1000 Pressure Temperature Relief Valve 1000 KPA 20mm 3/4" BSP designed to relieve the increase in pressure caused by water expansion during the normal heating cycle. The valve will then relieve the increase in pressure by releasing drips of hot water to the drain line. Should the electrical temperature cut-out device cease to operate correctly, the water will overheat. The temperature probe will then open the PTR valve and discharge hot water to the drain line. It is recommended that an ECV be fitted to the cold water supply line. This will relieve cold water, not hot water, during the heating cycle, saving energy and increasing the life of the PTR. Some local governments make it mandatory to install an ECV in the cold water line. PTR and ECV valves are safety valves and should be replaced every 4 years.